ENGINEERING, PROCUREMENT & CONSTRUCTION
COAL DRYER
FOR PT PJB ELECTRIC POWER GENERATOR UNIT PAITON
PJB
PRE-QUALIFICATION DOCUMENT
Number :
Date : 6th of July 2012
Procurement Department
PT P JAWA – BALI
HEADQUARTER OFFICE
2012
TABLE OF CONTENTS
1.
INTRODUCTION
2.
PREQUALIFICATION DOCUMENT
3.
BRIEF DESCRIPTION OF THE WORK
4.
SECHEDULE OF PREQUALIFICATION
5.
QUALIFICATIONS OF PARTICIPATING COMPANY
6.
DOCUMENTS REQUIRED FOR PREQUALIFICATIONS
7.
EVALUATION PROCEDURE FOR PREQUALIFICATION
LIST OF APPENDIXES
Appendix 1 : Letter of Expression of Interest
Appendix 2 : Letter of Agreement of the Formation of JO/
Consortium
Appendix 3 : Qualification Assessment Form
Appendix 4 : Integrity Pact
Appendix 5 : List of Work Experience References
1. INTRODUCTION
Companies/ Contractors who are
interested to participate in this pre-qualification tender must carefully read
and understand all of the terms listed in this Pre-qualification Document.
Protest against the result of this Pre-qualification will not be entertained ,
if the reason given is because of not reading
nor not understanding the document, and any damaged caused will be
solely the responsibility of the Company/ Supplier itself.
2.
PREQUALIFICATION DOCUMENT
2.1.
Pre-qualification Document is part of procurement
document which will be used as guidance in the process of document submission
in the pre-qualification stage by the Companies/contractor who are interested,
and guideline in evaluation process of pre-qualification by Procurement Staffs
of PT PJB.
2.2 Questions relating to this
Pre-qualification Document can be submitted in writing to :
Tim 3 – Procurement Unit PT P
No Facsimile: 031-
E-Mail: harry.@p.com
/ henry.@p.com
3.
BRIEF DESCRIPTION OF THE WORK
3.1.
Intent and purpose of this Coal Dryer work in
EPC (Engineering, Procurement, Construction)
in PT P in Paiton Power Plant Unit is to acquire the Coal Dryer system
and process in accordance with the conditions and needs of PT P Paiton Power
Plant Unit , namely :
3.1.1. Coal drying technology to be used must utilize
waste heat from the Power Plant as a main source of heat / energy.
3.1.2. Coal drying technology to be used must be integrated
both mechanically and systematically with the control system of Power Plant
3.1.3. Coal
drying technology to be used must have its own protection system that ensures
the level of security against the potential of self-combustion due to the
drying process of the coal.
3.1.4. Coal drying technology to be used must have
been proven to operate well in another Power Plant with a capacity of 400 MW
minimum for minimum 1 (one) year.
3.1.5. Coal dryer must have an evaporative capacity
of minimum 70 tons/ hour.
3.2.
Design Specifications required by PT P are :
3.2.1. Coal dryer uses waste heat as primary source
of heat / energy, the waste heat is from the condenser, from flue gas before
the chimney or bypass from secondary air preheater and drain from LP heater.
3.2.2. Coal
dryer must be able to be operated continuously (24 hours/day and 350
days/year), and technology offered must have been proven to operate well in any
Power Plant.
3.2.3. Contractor must be able to provide guarantee /
warranty of the performance of coal dryer system offered. The warranty which
must be given is that the total amount of moisture that can be vaporized is
minimum 15% (fifteen percent). In addition, 12 (twelve) months guarantee to be
given for the condition of coal dryer equipment against any damage.
4. TIME SCHEDULE OF
PRE-QUALIFICATION
4.1. Registration and Collection of Prequalification Document:
Date: 9th to 19th of July 2012
Time: 08:00 WIB to 15:00 WIB (WIB
= Western Indonesia Time Zone)
Place PT P Kantor Pusat
Up.
Tim 3 Procurement Unit
Jl.
K No. 11, S
4.2. Submission of
Pre=qualification Document
Date: 18th to 20th
of July 2012
Time: 08:00 WIB to 15:00 WIB (WIB
= Western Indonesia Time Zone)
Place PT P Kantor Pusat
Up.
Tim 3 Procurement Unit
Jl.
Ke No. 11, S
No comments: